Showcase

 

Production of 12-E-01 Test Ring for Heat Exchanger 

( RAW STATE )  for WRPC

 

Machining  of 12-E-01 Test Ring for Heat Exchanger 

( RAW STATE ) for WRPC

 

 

Machining of 12-E-01 Test Ring for Heat Exchanger 

( RAW STATE ) for WRPC

 

 

Marking out  of 12-E-01 Test Ring for Heat Exchanger 

( RAW STATE ) for WRPC

 

 

 

FIRST NIGERIAN ATTEMPT -2009

Successfully fabricated the left hand set, high grade chrome alloy quality to replace the imported right hand set of:

High Pressure and low pressure liners for 79KOI KRPC, Kaduna

Hydrogen Compressor for KRPC Turn Around Maintenance (TAM) 2009 (Valued @ 30%  cost of Importation).

 

Successfully fabricated pre-heater burners for WRPC crude lines. Year 2001

 

500kg - 1000kg Capacity  (Ferrous & non-ferrous) Mobile Tilting Furnace, first of its kind ever, designed and fabricated by Engr. Steve Mojugbe for the Nigerian environment.

 

FIRST NIGERIAN ATTEMPT -2011

Successfully fabricated the strainer for WRPC, FCC Compressor 12-K-0

(Imported Cone on the left, Steve Emma Strainer on the right. Specifications immediately below the image)

 

NOMINAL PIPE SIZE “D”

CONE LENGTH “L”

 

Steve Emma and Associates Product Specification of  Cone Tip Filter/Strainer

DIN X5CrNi -189 A1S1 - 304

C= 0.08%, Si 1.00%, Mn = 2.00%, P=0.04%, S=0.03%, Ni=8.00% – 11.00%, Cr=18.00% – 20.00%.

Aggregate hole mesh – 9.5mm Asymmetric shape

UTS. 520Nmm2, PS = 206Nmm2

13 – 14 inch pipe.

 

609

 

16”

687

 

18”

761

 

20”

863

 

24”

1015

 

26”

1117

 

28”

1193

 

30”

1269

 

32”

1371

 

34”

1447

 

36”

1523

 

42”

1777

 


FIRST NIGERIAN ATTEMPT – 2002, 2004 & 2005
Successfully designed, fabricated loader arm drop pipes for Depot  Station PPMC Warri